MAN Diesel & Turbo Completes Power Plant Project in Nicaragua

Release Date: 2017-07-19

Source: MAN Energy Solutions News

MAN Diesel & Turbo successfully commissioned eight type 18V48/60 engines in the new “Planta MAN 140” power plant in Los Brasiles, Nicaragua and handed them over to the operator, ALBA Generación S.A.

Based in Augsburg, the company is also responsible for engineering and delivery of the engines and equipment, steel structure, piping and electrics. With a generation capacity of 140 MW, Planta MAN 140 is the largest and most cutting-edge thermal power plant in Nicaragua and has a share of around 12% of the total capacity nationwide. The engines run on heavy fuel oil (HFO).


Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/pdvpower2014/pdvpower.net/wp-includes/formatting.php on line 4382

Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/pdvpower2014/pdvpower.net/wp-includes/formatting.php on line 4382

Deprecated: Function get_magic_quotes_gpc() is deprecated in /home/pdvpower2014/pdvpower.net/wp-includes/formatting.php on line 4382

Notice: compact(): Undefined variable: limits in /home/pdvpower2014/pdvpower.net/wp-includes/class-wp-comment-query.php on line 853

Notice: compact(): Undefined variable: groupby in /home/pdvpower2014/pdvpower.net/wp-includes/class-wp-comment-query.php on line 853